F-22 Add/Alt Hangar for Low Observable Composite Repair
The project involved the design-bid-build addition and alteration of existing Tyndall AFB, FL hangar for installation of two (2) paint booths for F-22 aircraft. The existing hangar was adjacent to an airfield. One area of the hangar involved the alteration of 11,200 SF which involved demolition of existing features. A 4,300 SF addition was necessary for the new administration area.
Project Details
OWNER
U.S. Army Corps of Engineers
LOCATION
Tyndall Air Force Base, FL
FINAL CONTRACT AMOUNT
$13,564,863