Renovations to Squadron Ops Bldgs 1050 & 1052

This project was the demolition and renovation of interior spaces to accommodate the new buildings’ user mission requirements. It provided new office
space with designated offices, a conference/meeting room, a breakroom, work areas and locker rooms as well as providing an exterior fan at the existing covered exterior pavilion area.
Features of work included total building commissioning, demolition, asbestos abatement, concrete and sealing, masonry, steel joist framing, steel decking, rough and finish carpentry, laminate clad architectural and solid surface casework, metal roofing, stone-coated metal roof tiling, steel doors and frames, wood doors and door hardware, aluminum framed entrances and storefronts, windows and glazing, gypsum board and acoustical ceilings, carpeting, ceramic and vinyl composition tiling, resilient flooring, painting, interior and exterior signage, operable partitions, toilet compartments and accessories, kitchen appliances, canopy fan, lockers, FFE package, auditorium seating, wet pipe sprinkler fire protection system, plumbing, HVAC, DDC system, commissioning of systems, electrical, fire alarm system and mass notification system, earthwork, sidewalks and paving, landscaping, architectural metal privacy fencing, sanitary sewer, storm drainage and water distribution systems.

Project Details

LOCATION

Maxwell AFB, FL

CONTRACT NUMBER

W9127822D0054/W9127823F0217

CLIENT

USACE

AWARD DATE

June 30, 2023

COMPLETION DATE

February 2025

FINAL CONTRACT AMOUNT

$7,624,679

We Deliver

We are ready to put our expertise to work for you. Contact us today and learn more about how Southeast Cherokee Construction can help meet your project needs.