The Award consists of all work associated with the four (4) projects described:

Project 1: KC-46A ADAL Bldg. for AGE/Fuselage Training
This project is for the conversion of the existing Corrosion Control Hangar (Building 4822) into the Fuselage Trainer (FUT) and Aerospace Ground Equipment (AGE) repair shop. The interior of the building will be altered by installation of all necessary walls and utilities. The hangar door opening will be enclosed and roll up doors will be installed for FUT and AGE access. A covered outdoor storage area for FUT pallets will be constructed, to include the associated concrete pavement required for vehicle circulation. This project is approximately 18,000 SF of renovation and approximately 10,000 SF of new construction.

Project 2: KC-46A ADAL Squadron Operations Facilities
This project is for the renovation of the existing Squadron Operations/Simulator Facility (Building 4916) and for an addition to the Operations Training Facility (Building 4906) to accommodate new KC-46A equipment. This project will include upgrading training areas in Building 4916 to accept the new KC-46A Weapons System Trainer (WST), Boom Operator Trainer (BOT), and Pilot Part Task Trainer (PPTT). This project also includes the construction of an addition to Building 4906 for climate controlled storage for Aircrew Flight Equipment (AFE). This project is approximately 5,000 SF of renovation and approximately 1,800 SF of new construction.

Project 3: KC-46A ADAL Maintenance Facility
This project is for the renovation of the existing Aircraft Maintenance Facility (Building 4908) to accommodate maintenance functions for the incoming KC-46A airframe. This project will include a new composite shop and associated administrative space. Repair of the building roof also will be included in this project. This project is approximately 16,000 SF.

Project 4: KC-46A ADAL Supply Areas (Design-Bid-Build FSRM)
This project is for the renovation of Building 4810 for secure storage area for the KC-46 airframe support equipment. This project will include the installation of wire partitions, upgrade of lighting in the warehouse area, cleaning of the epoxy floor in the warehouse area. This project is approximately 8,000 SF.

The Award also contains several Options for equipment (i.e., compressed air system, walk in oven, walk in freezer, etc.). The furniture package; including standard systems furniture, freestanding furniture, and demountable partitions walls; will be funded, procured, and installed separately from the construction contract.

Project Details

OWNER

U.S. Army Corps of Engineers

LOCATION

Goldsboro, NC

COMPLETION DATE

January 2020

FINAL CONTRACT AMOUNT

$9,995,060