Design-Build KC-135 Beddown OG MXG Headquarters
This project involved the design-build of a new one story 14,227 SF Headquarters Facility. The new facility provided administrative office space for active duty and reserve duty groups, conference meeting room, and supporting functions to include an FF&E package.
The facility is located between existing buildings along the flight line aircraft parking apron and the building forms part of the flight line perimeter, so the design and construction always maintained current flight line operations and perimeter security. Work was phased to continue current operations and security of the flight line operations as well as the current operations to the adjacent occupied existing facilities and site activities. Necessary temporary barriers and construction, safety and controls, lighting, signage, exit access and pathways and access to exits to the public way, access for maintenance personnel and equipment, and access for emergency personnel and equipment were provided throughout the project.
Features of work included demolition, concrete, masonry, structural steel, light gage steel trusses, steel decking, standing seam metal roofing, finish and rough carpentry, laminate clad architectural and solid surface casework, air barrier system, aluminum-framed entrances and storefronts, steel doors and frames, wood doors and door hardware, metal framing, modular carpet, cement stucco, painting, gypsum board and acoustical ceilings, ceramic tile, resilient flooring, toilet compartments and accessories, interior and exterior signage, FF&E package, wet pipe fire protection system, plumbing system, HVAC system, DDC system,
commissioning of systems, electrical systems, lightning protection, fire alarm system and mass notification system, earthwork, excavation and fill, asphalt paving, seeding and sodding, chain link fences and gates, water distribution system, sanitary sewer system, storm drainage system, electrical distribution system, building information system and other site improvements.
Project Details
LOCATION
MacDill AFB, FL
CONTRACT NUMBER
W91278-16-D-0015/W9127819F0473
CLIENT
USACE
AWARD DATE
9/26/2019
COMPLETION DATE
August 2021
FINAL CONTRACT AMOUNT
$8,323,242