JAG School Expansion
This project was the construction of a 39,766 SF two (2) story addition to the existing Judge Advocate General School (JAG).
Features of work included total building commissioning, demolition, concrete and precast, exterior brick, structural steel, steel joist framing, steel decking, rough and finish carpentry, laminate clad architectural and solid surface casework, air barrier system, modified bituminous roofing, stone-coated metal roof tiling, steel and aluminum doors and frames, wood doors and door hardware, overhead coiling doors, aluminum windows, gypsum board and acoustical ceilings, carpeting, ceramic and vinyl composition tiling, painting, interior and exterior signage, operable partitions, toilet compartments and accessories, dock lifts, FFE package, hydraulic elevator, wet pipe sprinkler fire protection system, plumbing, HVAC, DDC system, commissioning of systems, electrical, energy monitoring system, extensive data and communication systems as well as audio visual systems were installed, fire alarm system and mass notification system, earthwork, termite control, asphalt paving, sidewalks, landscaping, chain link fencing, sanitary sewer, storm drainage and water distribution systems and natural gas distribution.
Project Details
LOCATION
Maxwell AFB, AL
CONTRACT NUMBER
W91278-19-C-0017
CLIENT
USACE
AWARD DATE
May 18, 2019
COMPLETION DATE
September 2021
FINAL CONTRACT AMOUNT
$17,154,163