
KC-46A SE Shop & Storage Facility
This project encompasses comprehensive additions and alterations to the KC-46A SE Shop and Storage Facility (Building 552), to enhance aircraft maintenance, equipment storage, and operational support capabilities.
Interior improvements include demolition and relocation of the CTK Tool Room; reconfiguration and renovation of office, break room, and training spaces; installation of new epoxy flooring within the open shop area; and associated architectural, structural, mechanical, electrical, plumbing, fire protection, fire alarm, and building control system upgr ades.
Exterior improvements include the delegated design and construction of an approximately 10,000-square-foot steel canopy for Aerospace Ground Equipment (AGE) storage on the airfield side of Building 552. Supporting site work includes earthwork, pavement construction and improvements, fencing and gates, drainage, stormwater and utility infrastructure, and associated site restoration.
The project integrates improvements to the existing facility with new covered equipment storage and supporting airfield infrastructure to accommodate KC-46A maintenance and operational requirements.
Project Details
LOCATION
MacDill AFB, FL
CONTRACT NUMBER
W9127824D0034/W9127827FA015
CLIENT
USACE – Mobile District
AWARD DATE
November 23, 2026
COMPLETION DATE
May 2028
CONTRACT AMOUNT
$6,310,802


